Even with the best maintenance routines in place, mechanical systems such as air conditioning plant still carry some risk of problems. And when a key component needs attention, the challenge is to restore full operation as quickly and as cost effectively as possible.
Facing this challenge at the headquarters of a utility company, Daikin brought in specialist help to cut the time and cost of refrigerant recovery. Although the incident occurred in Spring, when outdoor conditions were temperate, the aim was to minimise any discomfort for staff in the office.
The Solution
Bristol Water’s three-storey HQ at Bedminster Down has three Daikin VRV IV heat recovery modules outdoors, with total capacity of 40hp. These serve 25 indoor units, including concealed ceiling units (medium static pressure) and under-ceiling cassettes. The system is charged with 45-50kg of R410A.
One of the outdoor units needed work – necessitating recovery of the entire refrigerant charge so that the component could be changed.
For the Bristol project, Daikin called in A-Gas, its refrigerant reclaim partner, and international specialists in the supply and lifecycle management of refrigerants and other gases. The A-Gas rapid recovery vehicle arrived on site at 08:30 and after accessing the units on the roof, positioning the vehicle and pulling 100 feet of hose up to the roof, its crew removed the Schrader valves and connected the recovery lines.
Time savings amounted to around one man-day and there was no need to hire cylinders, because A-Gas rapid recovery team brought then as part of the recovery service. A further benefit is that the gas will be reclaimed and returned to the supply chain as equivalent to virgin gas. This also has the benefit of being additional to the F-Gas quota system.
With the combined benefits of the powerful A-Gas recovery machine and Daikin’s ready availability of spare parts across its entire range of systems, disruption of air conditioning in this instance was just two days – at least a day less than it might have been.”
Martin Passingham Daikin DX product manager
Learn More
Other Case Studies
-
Refrigerant removal Bristol Waters
-
David Lloyd Beaconsfield
-
Office Premises in Malvern
-
60 Grays Inn Road
-
Denstone Hall Farm
-
Uttoxeter Racecourse
-
CP Sierra Engineering
-
Dean Clough Mill
-
Hotel Refurb Central London
-
The Jungle
-
Handelsbanken Halifax Branch
-
Halcyon Medical
-
Japan House, Kensington
-
The Salthouse Hotel, Northern Ireland
-
Architectural heritage site
-
Albany House
-
Crowne Plaza, Basingstoke
-
Beaumont Court
-
Blakes Farm, West Sussex
-
The Warrington Family, Swinton
-
Classic Cottage, Cornwall
-
Taper Studios London
-
The Croke Family, Guildford Case Study
-
Cawsand Bay
-
Grand Central Hotel Northern Ireland
-
Weir House, Bristol
-
Best Western Moores Hotel, Guernsey
-
Royal Marsden
-
Yorkshire Hotel
-
Lush Store, Edinburgh
-
Hyde Park Gardens
-
The Bloomsbury Hotel
-
Coral Hatfield
-
Wilton Row Project
-
London Bank
-
Pomme d'Or Hotel
-
Great Eastern Street Hotel
-
Leon restaurant
-
Astor House
-
Ascent Farnborough
-
Citadines Hotel
-
Coventry University Technology Park
-
K-Way
-
Homefield Grange Spa
-
Wensum Place, Bromley
-
The Boston Mayflower
-
Dickleburgh Stores
-
Citadines Hotel, Barbican
-
Thirteen Group
-
Merlin Housing
-
Historic Cornish Cottage
-
Portcullis House
-
Kew Road
-
Montcalm Hotel
-
Smith and Wollensky
-
Grand Hotel York
-
Oxford Brookes University
-
Holiday Inn Express
-
West Thames College
-
Carlton Club, Portsmouth
-
Bang and Olufsen
-
Dale Amateur Boxing Club
-
St George's Kew
-
BrewDog Hotel
-
Lansdowne Road
-
Kings Park Village
-
Chester Hotel, Aberdeen
-
Bennachie Hills, Aberdeen
-
Hafod Caves
-
British Airways i360
-
Croakers Hatch
-
cooling concept for the Engelbert Strauss CI Factory
-
Desco showroom
-
customised air conditioning for shopping centre
-
L1 DOT Complex Poland
-
Cha No Ma
-
High energy efficiency for comfort cooling in Middle East conditions
-
Perial Asset Management
-
Warm pool water through heat recovery
-
What to consider when choosing a heat pump for a residential building
-
New office building for hotel outfitter TKS in Borken
-
Electricity North West
-
40 Clarendon Road
-
City Centre Hotel
-
Engineer’s quest for efficiency and comfort proves a real game-changer
-
Training Centre Belgium
-
Naturkost Brinkman
-
Meeting a hospital’s cooling needs and keeping power input low
-
VRV heat pump contributes to low carbon footprint
-
Is R-32 really losing relevance in the refrigerant game?
-
Hotel Santos Porta Fira
-
Providing a complete HVAC system for a food processing plant
-
ACTION
-
A Chiller Solution For A Complex Of Office Buildings
-
Office refurbishment in Madrid, Spain
-
Making hospitals more efficient
-
Ashcraig, Scotland
-
Conversion of an old R-22 system
-
Merlin Properties
-
Cooling and heating for small residential buildings
-
Residential property with home office
-
Courtyard Hotel Paris
-
Zome
-
A high efficiency solution for a residential building
-
JBC
-
Sound enclosure case study in Flassy
-
Hoteles Santos • Las Arenas
-
Providing cooling for an industrial manufacturer of automotive components
-
Action reclaimed refrigerant allocation
-
Hotel St. Annen
-
Daikin Emura, design solution for residential living
-
Providing cooling & heating for small residential buildings
-
Samrya 44
-
Velocity office building
-
Energy efficiency
-
Prezzemolo & Vitale - Palermo
-
Extension of the L∞P programme by Daikin to chillers
-
chillers with R-32 refrigerant at Heinzinger electronic
-
Hock Ridge Farm