Development of a new facility within an existing land locked building for a busy central city medical practice provided a unique mix of heating and cooling challenges – but they were no match for the versatility of Daikin VRV IV systems.
Daikin’s strip and rebuild service solved a major installation headache for an efficient air conditioning system that recovers waste heat to provide an economical energy source for heating water.
Halcyon Medical is an NHS facility in Birmingham that has moved from cramped accommodation in a 400m2 Boots basement to more than 1,000m2 in nearby Martineau Place – a modernised retail and commercial complex on Corporation Street.
A Daikin VRV IV Heat Recovery system is at the core of the installation which provides cooling, heating, hot water and ventilation for the new first-floor premises.
The three-pipe heat recovery system offers excellent operating efficiencies, simultaneous cooling and heating if needed, and the facility for waste heat to be economically re-used as hot water.
For Halcyon Medical, these benefits are channelled into the production of hot water for both sanitary use and hot water for radiators in clinical areas where there are no air conditioning units. Recovered heat is boosted in three high temperature VRV Hydro boxes and a 200-litre storage cylinder satisfies all hot water requirements with fast recovery times.
Sarah Webster
“In our old premises we had the same air conditioning system as the shop above us. But there was no control, so some people were too hot while others were too cold. “Now we have complete control of our environment, with controllers in each area – so we should have much happier patients and staff . We also have some natural light, which is much appreciated.
A change was made for the better
“Previously, air conditioning was part of the rent, so we can’t really make
any comparisons with the Daikin system. But we are confident that
with the inherent efficiency of the system, sensible usage and good
maintenance, we will get good value for our money over many years to
come.”
Six Daikin VAM ventilation units ensure a continuous supply of fresh air for the practice, which passes through an efficient heat exchanger to ensure that outdoor temperatures place minimal load on the air conditioning systems.
The systems are controlled by premium wired controllers, with overall control through a Daikin Intelligent Touch Manager.
Halcyon Medical is served by wall-mounted units in the consulting rooms, treatment rooms and administrative areas, with Round Flow cassettes in larger open areas such as the waiting rooms and general office areas.
Learn More
Other Case Studies
-
Grand Central Hotel Northern Ireland
-
Denstone Hall Farm
-
Dean Clough Mill
-
Hyde Park Gardens
-
Pomme d'Or Hotel
-
Portcullis House
-
Coventry University Technology Park
-
Taper Studios London
-
Japan House, Kensington
-
Beaumont Court
-
Halcyon Medical
-
The Salthouse Hotel, Northern Ireland
-
The Jungle
-
Crowne Plaza, Basingstoke
-
Best Western Moores Hotel, Guernsey
-
Royal Marsden
-
Citadines Hotel, Barbican
-
Lush Store, Edinburgh
-
Albany House
-
The Bloomsbury Hotel
-
Coral Hatfield
-
Wilton Row Project
-
Great Eastern Street Hotel
-
Leon restaurant
-
Blakes Farm, West Sussex
-
The Warrington Family, Swinton
-
Classic Cottage, Cornwall
-
David Lloyd Beaconsfield
-
The Croke Family, Guildford Case Study
-
Refrigerant removal Bristol Waters
-
Cawsand Bay
-
Weir House, Bristol
-
Smith and Wollensky
-
60 Grays Inn Road
-
Homefield Grange Spa
-
Grand Hotel York
-
Wensum Place, Bromley
-
Office Premises in Malvern
-
The Boston Mayflower
-
Uttoxeter Racecourse
-
Dickleburgh Stores
-
Architectural heritage site
-
CP Sierra Engineering
-
Yorkshire Hotel
-
Thirteen Group
-
Hotel Refurb Central London
-
Merlin Housing
-
Historic Cornish Cottage
-
Handelsbanken Halifax Branch
-
London Bank
-
Montcalm Hotel
-
Holiday Inn Express
-
West Thames College
-
Chester Hotel, Aberdeen
-
Kew Road
-
British Airways i360
-
Citadines Hotel
-
Kings Park Village
-
Dale Amateur Boxing Club
-
Hotel St. Annen
-
Velocity office building
-
Oxford Brookes University
-
Lansdowne Road
-
Carlton Club, Portsmouth
-
Bang and Olufsen
-
Astor House
-
Bennachie Hills, Aberdeen
-
St George's Kew
-
BrewDog Hotel
-
Hafod Caves
-
Ascent Farnborough
-
Croakers Hatch
-
K-Way
-
City Centre Hotel
-
Engineer’s quest for efficiency and comfort proves a real game-changer
-
Training Centre Belgium
-
Naturkost Brinkman
-
Meeting a hospital’s cooling needs and keeping power input low
-
cooling concept for the Engelbert Strauss CI Factory
-
VRV heat pump contributes to low carbon footprint
-
Desco showroom
-
Is R-32 really losing relevance in the refrigerant game?
-
Hotel Santos Porta Fira
-
customised air conditioning for shopping centre
-
Providing a complete HVAC system for a food processing plant
-
ACTION
-
A Chiller Solution For A Complex Of Office Buildings
-
Office refurbishment in Madrid, Spain
-
Making hospitals more efficient
-
Ashcraig, Scotland
-
Conversion of an old R-22 system
-
L1 DOT Complex Poland
-
Merlin Properties
-
Cooling and heating for small residential buildings
-
Cha No Ma
-
Residential property with home office
-
High energy efficiency for comfort cooling in Middle East conditions
-
Courtyard Hotel Paris
-
Zome
-
A high efficiency solution for a residential building
-
JBC
-
Sound enclosure case study in Flassy
-
Hoteles Santos • Las Arenas
-
Providing cooling for an industrial manufacturer of automotive components
-
Perial Asset Management
-
Action reclaimed refrigerant allocation
-
Daikin Emura, design solution for residential living
-
Providing cooling & heating for small residential buildings
-
Samrya 44
-
Warm pool water through heat recovery
-
What to consider when choosing a heat pump for a residential building
-
Energy efficiency
-
Prezzemolo & Vitale - Palermo
-
New office building for hotel outfitter TKS in Borken
-
Extension of the L∞P programme by Daikin to chillers
-
chillers with R-32 refrigerant at Heinzinger electronic
-
Electricity North West
-
40 Clarendon Road
-
Hock Ridge Farm