An office building at the edge of Farnborough Airport – regarded as the cradle of the UK’s ‘air’ industry – has a pioneer installation of new air conditioning delivery technology from Daikin. Ascent 3 is one of four commercial buildings forming the Farnborough Aerospace Centre, on the south side of the airport. The 45,000 sq.ft, three storey building was recently refurbished and has since been let to the UK arm of an international financial services group.
As part of the Category A fit-out prior to re-marketing the 30-year old building. A Daikin VRV IV heat recovery air conditioning system was installed. Roof-mounted condensing units served concealed ducted units that discharged through ceiling and perimeter grilles.
‘Easy’ ducted solution ensures comfort in new tenant’s huddle zones
Much of the working space is open plan, but the new tenant had specific requirements for partitioned meeting rooms – some with audio visual systems – and informal huddle spaces. There is also a staff café on the first floor.
To minimise alterations to the already installed Daikin system, the solution was to install Daikin Easyzone units and additional ductwork to 21 fan coils – including two 8kW ducted units – that were added to the system.
One of the consultants said: “It was the first time I’d come across Easyzone. If it hadn’t been for them we would probably have had to take out some of existing fan coil units and replace them with smaller units for the meeting rooms. There was congestion of services within the ceiling voids, so this would have been quite problematic. From a co-ordination and cost point of view, Easyzone was a great piece of kit enabling us to reuse what was already there. I think it’s a more sustainable solution as well.”
Related articles
Easyzone is a recent addition to the Daikin solutions portfolio. Easyzone units enable a single ducted fan coil to serve between two and eight separate zones through individual ducts.
Occupants of each zone can select a temperature set point via a Blue face controller. Sensors within the controller adjust a motorised damper in the Easyzone unit to increase or decrease the flow of air to the zone.
Learn more
Other case studies
-
Office Premises in Malvern
-
Astor House
-
Refrigerant removal Bristol Waters
-
Ascent Farnborough
-
Electricity North West
-
Architectural heritage site
-
40 Clarendon Road
-
60 Grays Inn Road
-
Albany House
-
Montcalm Hotel
-
Oxford Brookes University
-
Holiday Inn Express
-
Halcyon Medical
-
Japan House, Kensington
-
West Thames College
-
Grand Central Hotel Northern Ireland
-
Weir House, Bristol
-
Carlton Club, Portsmouth
-
cooling concept for the Engelbert Strauss CI Factory
-
Denstone Hall Farm
-
Desco showroom
-
customised air conditioning for shopping centre
-
Uttoxeter Racecourse
-
Bang and Olufsen
-
Best Western Moores Hotel, Guernsey
-
The Salthouse Hotel, Northern Ireland
-
L1 DOT Complex Poland
-
CP Sierra Engineering
-
Cha No Ma
-
Dean Clough Mill
-
Royal Marsden
-
Yorkshire Hotel
-
Dale Amateur Boxing Club
-
High energy efficiency for comfort cooling in Middle East conditions
-
Homefield Grange Spa
-
Smith and Wollensky
-
Lush Store, Edinburgh
-
David Lloyd Beaconsfield
-
Hotel Refurb Central London
-
Perial Asset Management
-
St George's Kew
-
Hyde Park Gardens
-
The Jungle
-
BrewDog Hotel
-
Warm pool water through heat recovery
-
Coventry University Technology Park
-
The Bloomsbury Hotel
-
Coral Hatfield
-
What to consider when choosing a heat pump for a residential building
-
Handelsbanken Halifax Branch
-
Wilton Row Project
-
London Bank
-
New office building for hotel outfitter TKS in Borken
-
Pomme d'Or Hotel
-
K-Way
-
Great Eastern Street Hotel
-
Leon restaurant